QCM Summary
0 of 20 Questions completed
Questions:
Information
You have already completed the qcm before. Hence you can not start it again.
QCM is loading…
You must sign in or sign up to start the qcm.
You must first complete the following:
Résultats
Résultats
Temps écoulé
You have reached 0 of 0 point(s), (0)
Earned Point(s): 0 of 0, (0)
0 Essay(s) Pending (Possible Point(s): 0)
Catégories
- Pas classé 0%
-
You failed your accreditation. Start a new MCQ.
-
Congratulations, you succeed your accreditation.
You agree to follows all these rules. Your accreditation is valid for 1 year. To know the end date of your accreditation, click on the menu MY ACCOUNT. You may need to take again before this date, in case of new version of NovelisPAE specification. You can also take again the MCQ if you wish. To exit, close your browsner.
- 1
- 2
- 3
- 4
- 5
- 6
- 7
- 8
- 9
- 10
- 11
- 12
- 13
- 14
- 15
- 16
- 17
- 18
- 19
- 20
- Current
- Review
- Répondu
- Exact
- Inexact
-
Question 1 of 20
1. Question
1 – ORDER
What we expect from you at order reception:
1 – Compliance with general technical specifications
• Surface protection (tech. spec. 364 130 ST1)
• General tolerances for welded assemblies (tech. spec. 000 501 ST1)
• Technical specification for logistics (tech. spec. 000 601 ST1)
2 – Consideration of documents transmitted with the order
3 – Sending of an order acknowledgement within a week of receiving the order.
1-1 What is the minimum paint thickness required at every point of the equipment, if polyurethane paint is used?
ExactInexact -
Question 2 of 20
2. Question
1-2 What is the general tolerance for a dimension greater than 50mm, if there is no specific tolerance?
ExactInexact -
Question 3 of 20
3. Question
1-3 What documents are annexed to the order?
ExactInexact -
Question 4 of 20
4. Question
1-4 What information must the order acknowledgement include?
ExactInexact -
Question 5 of 20
5. Question
1-5 Within what maximum time must I return the order acknowledgement?
ExactInexact -
Question 6 of 20
6. Question
2 – PRODUCTION
Good reflexes to have during production:
1 – Request written authorisation from Novelis PAE for any modification of a reference or manufacturing process
2 – Request written exemption in the event of a manufacturing difference
3 – Send delivery notes endorsed by the date and the receiver’s name for parts supplied by Novelis PAE
4 – Warn Novelis PAE as early as possible and in writing of any foreseen delay.
5 – All these requests must be forwarded to the Project Manager.
2-1 The trade reference is equivalent to the one ordered. Since it’s an equivalent item, do I need to warn Novelis PAE?
ExactInexact -
Question 7 of 20
7. Question
2-2 The drawing shows a weld but I prefer to manufacture this part by folding. My solution seems better but do I ask for Novelis PAE authorisation?
ExactInexact -
Question 8 of 20
8. Question
2-3 This part has residual oxy-acetylene burn marks that do not affect its operation. Do I warn Novelis PAE?
ExactInexact -
Question 9 of 20
9. Question
2-4 One month before the delivery date, I foresee a week’s delay. A week is not much, do I need to warn Novelis PAE?
ExactInexact -
Question 10 of 20
10. Question
2-5 Do I decide to warn the Design Office Manager to validate modifications?
ExactInexact -
Question 11 of 20
11. Question
3 – PRE-ACCEPTANCE
Pre-acceptance is performed by the supplier. For successful pre-acceptance:
1 – Assemblies must be complete and assembled as far as possible. Manufacturer and EC identification plates must be affixed and engraved
2 – Assemblies must be clean (oil, grease, marks, chips, weld splatter, etc.)
3 – Parts or unassembled or unmounted assemblies must be grouped together for each machine
4 – Individual labelling for each machine with Novelis PAE numbers of unassembled or unmounted parts
5 – Unmounted fixings must be sorted by machine and must be identified
6 – Results of these inspections must be entered on the inspection report, photos must be included and everything must be returned to the Project Manager.
An acceptance inspection by Novelis PAE cannot take place without having previously forwarded the inspection report and photos of the assembly to the Project Manager.
3-1 A limit switch is part of the assembly. Should I mount it?
ExactInexact -
Question 12 of 20
12. Question
3-2 Is it compulsory to fix and engrave manufacturer and EC identification plates for pre-acceptance?
ExactInexact -
Question 13 of 20
13. Question
3-3 I must supply a set of screws, which cannot be installed on the equipment.
ExactInexact -
Question 14 of 20
14. Question
3-4 I must fill in an inspection report. Should I wait for the Novelis PAE inspector to fill it in with him?
ExactInexact -
Question 15 of 20
15. Question
3-5 Sending photos before Novelis PAE acceptance can solve problems and save time.
ExactInexact -
Question 16 of 20
16. Question
5 – LOGISTICS
Transportation must be prepared based on Novelis PAE instructions. PAE.
These instructions are provided in technical specification 000 601 ST1..
5-1 What are the Novelis PAE recommendations regarding protection of unpainted surfaces?
ExactInexact -
Question 17 of 20
17. Question
5-2 When can I have an equipment item shipped without a packing list?
ExactInexact -
Question 18 of 20
18. Question
5-3 Is there a specific Novelis PAE form for the packing list?
ExactInexact -
Question 19 of 20
19. Question
5-4 What must the packing list include?
ExactInexact -
Question 20 of 20
20. Question
5-5 It is compulsory for large assemblies be plastic film-protected?